Blog Post 5

Blog Post 5

The past three weeks we were very busy working on a number of projects.

Salima Ikram came to work on the animal bone deposit in the tomb of Karabasken. Her time at the site, although short, was extremely productive. We all learned a lot trying to assist Salima as best we could. Salima is sorting bones in the tomb of Irtieru assisted by her student Nick Brown.

IMG_0901

We have completed the conservation of the vestibule in the tomb of Karakhamun. Katherine Blakeney is taking final photography of the ceiling.

DSCF8389

The arrival of Joy Stamp and Jane Golding revived the ceiling project. With thousands of painted ceiling fragments found on the floor of the collapsed tomb of Karakhamun reconstruction is not an easy task. Numerous patterns and their variations – seventeen in total – were identified so far. The geometric and floral designs are painted red, blue, yellow, white and black.

DSCF8342

It seems that the ceilings of the spacious rooms of the tomb were divided into segments featuring different patterns. The newly finished tomb looked extremely festive despite some unfinished and unpainted areas. Trying to create more space for their installations Joy and Jane purchased wood from the friendly owner of a wood workshop and ordered platforms, which they placed on top of the shafts in the tomb of Karakhamun.

DSCF2115

These new surfaces immediately became covered with beautiful designs.

DSCF8345

The big news in the tomb of Karabasken are the entrance steps to the tomb. The steps are getting stronger and stronger as they go down. It seems that Karabasken had an impressive entrance area with an elegant staircase. Nick Brown and Katherine Piper are taking measurements in the trench.

DSCF8425

All the finds from the field go to John Billman who takes great care of them.

DSCF8376

The Second Pillared Hall in the tomb of Karakhamun keeps growing. The North West corner is shaping up and soon will be able to receive its decoration consisting of the texts of BD 48 and 49 on the west wall and an offering scene on the north wall of the hall.

DSCF8450

Meanwhile, the conservators are working on the vignette of BD 15 in the south west corner.

DSCF8394

Not only tomb walls grow in South Asasif. The Project has adopted these adorable ginger twins. We see them as a good omen and hope to see them grow and prosper.

DSCF8444

The last day before the beginning of the holy month of Ramadan was very special. Our team was happy to have the chance to give a holiday present to everyone at the site.

IMG_1185

The workmen of the Project were in a true festive spirit. IMG_1225

To deliver the boxes to the conservators working in Karakhamun we had to form an offering bearing procession. How appropriate!IMG_1291

RAMADAN KAREEM to all our Egyptian friends and colleagues!

Advertisements

3 responses to “Blog Post 5

  1. It is looking wonderful Congratulations, Hi to you, Elena,John, Joy and Jane and all. I hope the rest of the season goes as well. I am in the middle of reading the book Elena it is great. Gallina

  2. I am totally in awe of the wonderful work which you do during this, the hottest season. Keep up the good work. i wish I was young enough to join you!

  3. Francesca Jones

    So lovely to receive this and see what has happened in the last month – what to be there! Met Annie on Saturday and discussed progress on BD17.

    Regards
    Francesca

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s